#3 WOOD OSB » PVC / FLOOR
HYBRI FLOOR
USE CASE OF » WOOD OSB » PVC / FLOOR
STEP #1
HYBRI FLOOR L8400 – For bonding PVC on OSB desk you don’t need to use penetration coating (surface must be clean and without deformation). Apply with a toothed trowel A2 along the entire length of the bonded surface. The floor is walkable after 24 hours, in participation on the absorbency of our laminate floors, height-applied adhesives. Fully loaded approx. after 48 hours.
CONSUMPTION CALCULATOR
Enter the values
The above text is for information only. You will find all the instructions in each individual product, where the technical and safety data sheets are located for all the information!